A finished timber frame home in New Hampshire typically costs $350-500 per square foot, according to figures published by Northeast timber frame companies (Vermont Frames, Davis Frame). That excludes land and site work, so a 2,000 sq ft house comes to roughly $700,000-1,000,000 before the well, septic system and driveway. The frame package is only part of that: Vermont Frames says frame plus SIPs, installed, is $100-150 per square foot, or about a quarter to a third of the total. All of these are supplier-published figures, so treat them as a starting range and get a bid for your own plan and lot.
What is the difference between a frame package and a turnkey timber frame home?
Most timber frame companies sell the frame (and often the wall and roof panels) and leave the rest of the house to a local builder. A turnkey price covers everything from foundation to finished floors. Mixing the two up is how people underbudget by half.
| Scope | What is usually included | Who usually provides it |
|---|---|---|
| Frame kit | Cut and labeled timbers, joinery, pegs, hardware, stamped engineering plans (New England Timber Frames) | Frame company |
| Frame + SIPs installed | Above plus SIP walls and roof, installation, often roof boards (Vermont Frames) | Frame company or its crew |
| Structural shell package | Timber frame, SIPs, framed panels, windows and patio doors, siding and trim, tongue-and-groove ceilings (Davis Frame) | Frame company supplies; builder installs |
| Turnkey home | Everything: site work, foundation, shell, roofing, mechanicals, finishes, labor | Builder or design-build firm |
New England Timber Frames lists what its kit price leaves out: shipping, foundation, SIPs, roofing, siding, windows, doors, interior finishes, plumbing, electrical, HVAC, the crane and on-site labor (New England Timber Frames). Vermont Frames’ list of exclusions also includes the first-floor deck framing, interior walls and stairs (Vermont Frames).
How much does a timber frame package cost? Published supplier prices
Each price here is published by the company selling the frame. We have not verified them against delivered projects, and several carry “subject to change” notes.
| Company (location) | Published price | Notes |
|---|---|---|
| New England Timber Frames (South Paris, ME) | Kits $36,000-52,000 (about $38-41 per living sq ft); custom frames $55,000-120,000+ | 2026 prices; 960-1,296 sq ft catalog frames; frame only |
| Brooks Post & Beam | ”Monadnock” 1,850 sq ft: frame $45,600, SIPs $41,700, total kit $96,800 ($52.32/sq ft) | Eastern white pine; R-23 walls, R-30 roof panels; excludes shipping and tax; undated |
| Brooks Post & Beam | ”Wolfeboro” 2,496 sq ft: frame $116,300, SIPs $75,850, total kit $203,950 ($81.71/sq ft) | Same notes |
| Vermont Timber Works (VT) | $12-20 per board foot in 2026; fancy trusses $35+/BF | Typical house uses 6,000-8,000 BF |
| Hamill Creek (BC) | Kit $60-90/sq ft; its kits page says $60-100/sq ft (Hamill Creek) | Includes design, engineering, delivery; raising quoted separately |
| Davis Frame (Claremont, NH) | Timber frame shell package $150+/sq ft; panelized $110+/sq ft | Shell includes windows, siding, T&G ceilings; $4,500 design fee credited to the package |
| Vermont Frames (VT) | Frame + SIPs installed $100-150/sq ft; 24x36 cape $153,000 base, $185,000 with exterior timber elements | Cape example priced in 2024 |
Hamill Creek’s own pages give two different kit ranges, $60-90 and $60-100 per square foot, and Vermont Frames labels its house examples as 2024 pricing, so expect them to be higher now. Ask any company for a current, dated quote.
The board-foot math
Vermont Timber Works prices by board foot, where one board foot is 12 x 12 x 1 inch, so a 6x8 that is 10 feet long holds 40 board feet (Vermont Timber Works). At its 2026 range:
- 6,000 BF x $12 = $72,000
- 8,000 BF x $20 = $160,000
That is the timber frame alone. SIPs, shipping and raising come on top.
How much does a finished timber frame home cost per square foot?
| Company | Finished cost per sq ft | Excludes |
|---|---|---|
| Vermont Frames | $350-500 (Northeast clients) | Land, site development |
| Davis Frame | $350-450+ | Land, site work |
| Hamill Creek | $400-500 turnkey | Land |
| New England Timber Frames | $200-275 modest (owner-GC, DIY raise); $275-400 mid-range; $400-600+ high-end | Land, permits, septic, well |
NETF’s low tier assumes you act as your own general contractor and help raise the frame. The other three assume a contractor builds the house. For comparison, New Hampshire stick-built custom homes run $200-350 per square foot by one brokerage’s count (nhrealestate.com) and $325-475 by a Seacoast builder’s (Oxland Builders). Our timber frame vs. stick built post compares the two directly.
What does a timber frame home budget look like? A 2,000 sq ft example
This budget applies the published ranges to a 2,000 sq ft timber frame home in the North Country. The math is ours; the inputs are cited.
| Line item | Range | Basis |
|---|---|---|
| Design fee (often credited to the package) | about $4,500 | Davis Frame |
| Timber frame + SIPs, installed | $200,000-300,000 | $100-150/sq ft x 2,000 (Vermont Frames) |
| Everything else in the house: foundation, windows, roofing, siding, mechanicals, finishes, builder overhead | $500,000-700,000 | $350-500/sq ft total minus the frame line |
| Construction subtotal | $700,000-1,000,000 | $350-500/sq ft x 2,000 |
| Well and septic | $15,000-40,000 (national supplier figure) | Hamill Creek |
| Driveway, clearing, power, ledge | Lot-specific | See our site costs guide |
| Contingency | 10-15% of construction | Hamill Creek |
| Rough total before land | about $800,000-1,200,000 | Subtotal + site + contingency |
The well and septic range is a national figure from a British Columbia company. In granite with deep bedrock wells, or on a lot that needs an engineered septic system, North Country site costs can run well above it. Price your lot before you price the frame.
What drives the cost of a timber frame?
Wood species
Native hemlock is the cheapest common species but weaker, so timbers get bigger, and it is not available free of heart center or in lengths over about 20 feet. Douglas fir costs more, especially free of heart center. Oak is more expensive, heavier and checks more (Vermont Timber Works). Eastern white pine grows here and is the standard species in Brooks Post & Beam’s kits (Brooks Post & Beam). Hamill Creek prices western red cedar about 30% above Douglas fir (Hamill Creek).
Joinery and complexity
More pieces mean more joints. Curved braces, arched bents and hammer beams take longer to cut, and steel gusset plates add cost. A simple square two-story house is the cheapest frame to build (Vermont Timber Works). New England Timber Frames says custom changes to its catalog frames typically add 15-30% (New England Timber Frames).
Footprint
Going up is cheaper than going out. A wing adds another set of posts, while a taller frame extends posts that are already there (Vermont Frames).
SIPs and energy code
Vermont Timber Works calls SIPs “very expensive” and suggests a stick-framed wrap insulated with mineral wool or fiberglass as a cheaper option, especially with many windows (Vermont Timber Works). Whichever you choose, the roof has to meet New Hampshire’s energy code. Grafton and Coos counties are climate zone 6A. The state’s compliance form allows R-30 cathedral ceilings only under 500 sq ft or 20% of the ceiling area; beyond that the requirement is R-49 (NH Energy Code, Chapter 4). A kit priced with R-30 roof panels may need thicker panels, at more cost, to pass in the North Country.
Snow load and engineering
Frames are engineered for site-specific snow and wind loads, and mountain frames cost more because they need bigger timbers or steel reinforcing (Vermont Timber Works). Bethlehem’s design ground snow load is 105 psf at 1,800 feet, rising 2.1 psf for every 100 feet higher (CRREL TR-02-6). A frame drawn for southern New Hampshire or a catalog default may need re-engineering. See our snow load and frost depth guide.
Crane, access and shipping
Raising a small catalog frame takes a crane and about five people for one to two days; NETF budgets $6,000-14,000 for that and $2,500-6,000 for shipping (New England Timber Frames). A steep, narrow or soft driveway adds crane time or a bigger crane. In spring, towns can post weight limits on local roads under RSA 231:191. There is no fixed end date; postings come off when the road base firms up (UNH Technology Transfer Center). Do not schedule a tractor-trailer of timbers for early April on a posted gravel road.
How much does a hybrid timber frame save?
Less than most people expect. The package price drops, but the finished price barely moves.
| Option | Package price | Finished price | Source |
|---|---|---|---|
| Davis Frame full timber frame | $150+/sq ft | $350-450+/sq ft | Davis Frame |
| Davis Frame hybrid | from $125/sq ft | $350-450+/sq ft | Davis Frame |
| Hamill Creek full custom | $60-100/sq ft kit | $350-500/sq ft | Hamill Creek |
| Hamill Creek hybrid | from $125/sq ft base | $350-450/sq ft | Hamill Creek |
On a 2,000 sq ft house, Davis’s $25-per-square-foot difference in package price is about $50,000. That is real money, but kitchens, baths, mechanicals and site work cost the same in both houses. A hybrid makes sense when you only want timber in the great room. It will not turn a $900,000 house into a $600,000 one.
How long does it take to build a timber frame home?
| Phase | Typical time | Source |
|---|---|---|
| Design | 2-5 months | Davis Frame |
| Production (scheduling and cutting) | 4-7 months; cutting and delivery about 8 weeks once design is final, longer May-November | Davis Frame |
| Septic design and NHDES approval | Weeks to months; required before you build | RSA 485-A:32 |
| Raise frame and install panels | 1-2 days for a small frame; about 2-3 weeks for a full structural package | NETF, Davis Frame |
| Finish the house | 6-12 months | Davis Frame |
Davis Frame puts the whole run from first design meeting to package delivery at 6-12 months. Count backward from when you want to raise. To raise in early summer, after mud season and with the shell closed before snow, the design work usually has to start the winter before or earlier. New Hampshire law requires state approval of the septic plans before you construct a building that will discharge wastewater (RSA 485-A:32), so start the septic design in parallel.
Code timing matters too. New Hampshire moved to the 2024 IRC on July 1, 2026, and permit applications filed from January 1, 2027 must use it (NH Division of Fire Safety). Plans drawn earlier to the 2021 code should be checked before you apply.
How do you work with a frame company and a local builder?
Most frame companies stop at the shell. Davis Frame, for example, designs and manufactures the frame and panels but does not build homes. It can send a technical advisor to work with your general contractor, and it says any good builder can put its homes together (Davis Frame).
| Task | Frame company | Local builder / GC |
|---|---|---|
| Frame design and engineering | Yes | Reviews for site, foundation and code |
| Permit, septic and site work | No | Yes |
| Foundation | Provides loads and layout | Builds it, square and level |
| Raising | Often, or provides advisor | Coordinates crane, staging, schedule |
| Windows, roof, siding | Sometimes supplies | Installs |
| Mechanicals and finishes | No | Yes |
A builder who knows the local subs, inspectors and roads is worth a lot up here, where the building season is short. We tell clients to bring the builder in before the frame design is final, so the foundation, utility runs and the crane plan get worked out once. Our guide to choosing a builder in New Hampshire covers what to ask.
New England Timber Frames says acting as your own general contractor can save 10-20% of total cost if you have time and local relationships (New England Timber Frames). That is a kit seller’s estimate. Construction lenders evaluate the builder’s ability to finish on schedule before they lend (NAHB), so ask yours whether it will lend to an owner-builder before you count on the savings.
What questions should you ask a timber frame company?
- What exactly is in the price: frame only, frame and SIPs, or a full shell? Is installation included?
- What date is the price from, and how long is it held?
- What species and grade, green or kiln-dried, boxed heart or free of heart center?
- Is the frame engineered for my town’s ground snow load at my elevation, and stamped by an engineer licensed in New Hampshire?
- What are the R-values of the wall and roof panels, and does the package meet zone 6 prescriptively, or will I need an energy model?
- What do shipping, crane and raising crew cost to my site? Who is responsible if the crane cannot reach the pad?
- What is the deposit, and when is the balance due?
- What is the lead time from signed design to delivery in the season I want to raise?
- Who protects the timbers and panels from weather between delivery and dry-in?
- Can you provide drawings and specs my lender and insurer will accept?
If you are planning a timber frame or hybrid home in Littleton, Franconia, Sugar Hill or nearby, Fregeau Builders can work alongside your frame company as the local builder. See our timber frame services or contact us to talk through a budget.
Sources
- Vermont Frames: Pricing (accessed November 2026)
- Davis Frame Company: Frequently Asked Questions (accessed November 2026)
- Davis Frame Company: Hybrid Timber Frame Homes (accessed November 2026)
- New England Timber Frames: Timber Frame Cost Guide 2026 (accessed November 2026)
- Brooks Post & Beam: The Monadnock (accessed November 2026)
- Brooks Post & Beam: The Wolfeboro (accessed November 2026)
- Vermont Timber Works: Frequently Asked Questions About Timber Frame Homes (accessed November 2026)
- Hamill Creek: Timber Frame Home Costs (accessed November 2026)
- Hamill Creek: Timber Frame Kits (accessed November 2026)
- Hamill Creek: Hybrid Timber Frame Homes (accessed November 2026)
- nhrealestate.com (Bean Group): The Rise of New Construction Homes in NH (accessed November 2026)
- Oxland Builders: How Much Does It Cost to Build a New Home in New Hampshire in 2026? (accessed November 2026)
- New Hampshire Energy Conservation Code 2018, Chapter 4 and Form EC-1 (UpCodes) (accessed November 2026)
- US Army Corps of Engineers ERDC/CRREL TR-02-6: Ground Snow Loads for New Hampshire (accessed November 2026)
- NH RSA 231:191: Maximum Weight Limits (accessed November 2026)
- UNH Technology Transfer Center: Frost Heaves, Gravel Roads and Seasonal Weight Limits (accessed November 2026)
- NH RSA 485-A:32: Prior Approval; Permits (accessed November 2026)
- NH Division of Fire Safety: State Building Code (accessed November 2026)
- NAHB: How to Choose a Log-Friendly Lender (accessed November 2026)